Monthly Checking by Crane Operator
| Remarks | |
| Subject: | |
| Date: | |
| Contractor: | |
| Crane operator: | |
| Site: | |
| LM No: |
1. Engine
| Report | Remarks | |
| Water level in radiator and reserve tank | ||
| Oil level and condition | ||
| Oil, water and fuel leakage | ||
| Fan belt tension | ||
| Air cleaner |
2. Hydraulic System
| Report | Remarks | |
| Hydraulic oil level and condition | ||
| Control lever & valve working condition | ||
| Pump working condition | ||
| Motor working condition | ||
| Hydraulic pump, motor & cylinders oil leakage | ||
| Control valve, rotating joint & piping oil leakage |
3. Electric System
| Report | Remarks | |
| Fluidl level in battery | ||
| Instruments working condition |
4. Safety Devices
| Report | Remarks | |
| Anti-two block, boom, over-hoist limiting & moment limiter, etc. |
5. Attachment
| Report | Remarks | |
| Appearance | ||
| Crack and deformation |
6. Travel Warning Device
| Report | Remarks | |
| Travel Warning Device |
7. Load/Radius & Automatic Safe Load/Indicators
| Report | Remarks | |
| load/radius & automatic safe load/indicators |
8. Motion Limit Switches
| Report | Remarks | |
| Motion limit switches |
9. The crane Boom
| Report | Remarks | |
| The crane boom |
10. Ballast
| Report | Remarks | |
| Ballast |
11. Winding Drum for Power Cable
| Report | Remarks | |
| Winding drum for power cable |
12. Rail Clamps
| Report | Remarks | |
| Rail clamps |
13. Rail Tracks
| Report | Remarks | |
| Rail Tracks |
14. Wheels & Axles of Rail Mounted Crane
| Report | Remarks | |
| Wheels & Axles of rail mounted crane |
15. Others
| Report | Remarks | |
| Others |
English
China
Japan
Indonesia