PTW – excavation trenching (= 1.5m) permit
Magicsoft Asia night
PROJECT :
EXCAVATION/ TRENCHING (≥ 1.5m) PERMIT
Part 1: Application
Validity Period (Date & Time of work) :
From: 09/08/2018 (Date) 19:00 (Time)
To: 10/08/2018 (Date) 07:00 (Time)
Contractor :
Magicsoft Asia
No. of Supervisors : test
Description of work : test
No. of Workers : 10
Daily Check By Work Supervisor-In-Charge and/or Safety Assessor (Yes, No, “NA“ for Not Applicable)
Minimum Safety Requirements
Approved Risk Assessments available Yes
Safe Work Procedures available Yes
PTW/ Location Plan displayed at place of work Yes
Workers are briefed on the hazards & corresponding control measures Yes
Workers are medically fit to work/ not feeling unwell/ not overworked Yes
Workers are reminded to do Last Minute Risk Assessment (LMRA) before start work Yes
Safety barriers & warning signs erected to prevent unauthorised entry Yes
Open sides & openings guarded by effective guard rail & barriers Yes
Adequate safe means of access into or egress out of excavation provided Yes
Designated person/ supervisor appointed for excavation works Yes
Daily inspection carried out by designated person Yes
Competent excavator operator appointed Yes
Daily inspection carried out by authorised operator Yes
Competent banks man appointed & clearly identified Yes
Adequate lighting provided at workplaces Yes
Temporary shoring provided for excavation ≥ 1.5m deep Yes
PE design calculation & drawing for temporary shoring ≥ 4m deep available Yes
PE Certificate of Supervision (COS) for temporary shoring available Yes
PE design calculation & drawing for excavation ≥ 1.5m deep (slope/ without shoring) Yes
PE certificate of supervision COS for slope available Yes
Adequate de-watering equipment available Yes
Inspection of work area after inclement weather – safe to work after inclement weather Yes
Others :
Part 2: Check & Endorsement
a) I have read & understood this permit & agree to work in accordance with the provisions of the RA/ SWP/ Method Statement & the safety requirements stated in this permit.
b) I have checked and satisfied that the confined space is safe & healthy for persons to enter and work in
a. Applicant / Work Supervisor (Manhole/ Confined Space/ Tunnel Supervisor)
Name Keke –
Signature
Time 16:56
b. Safety Assessor (Shimizu) (Confined Space Safety Assessor)
Name
Safety Assessor
Signature
Time 11:06
c. Shimizu Engineer/ Supervisor In-Charge (Manhole/ Confined Space/ Tunnel Supervisor)
Name Engineer
Signature
Time 11:07
Part 3: Issued By
a) I am satisfied that proper evaluation of risk & hazards involved based on available information
b) I am satisfied that the confined space is safe & healthy for person to enter and work in
c) I am satisfied that effective steps have been taken to prevent any ingress of toxic/flammable subst/gas/vapor
d) The working personnel are informed of the hazards & protection counter measures to be taken
Site Overall In-Charge (SC PM / Appointed Duty Personnel)
Name PM
Signature
Time 11:07
Part 4: Notice of Revocation or Closure
a) Work has been terminated/ completed
b) Housekeeping has been carried out
c) Work area is safe for other personnel
Applicant/ Work Supervisor (Manhole/ Confined Space/ Tunnel Supervisor)
Name Applicant
Signature
Time 11:08
Part 5: Confirmation of Revocation or Closure
a) Work has been terminated/ completed
b) Housekeeping has been carried out
c) Work area is safe for other personnel Site Overall In-Charge (SC PM / Appointed Duty Personnel)
Name PM
Signature
Time 11:08
Photo Attachment
Safety barriers & warning signs erected to prevent unauthorised entry | Confined Space Register available | Adequate safe means of access into or egress provided |
Suitable & Sufficient lighting provided at workplaces) | tinuously within CS & at the place of work | Environment within the confined space is safe for entry & safe to work in |