Checklist For Plastering

CHECKLIST FOR PLASTERING
PROJECT (Autofill by Project Name)
MT SOPHIA1
Reference Nos (Autofill by Form Number)
autofill

Block No.       

Storey No.       

Plot No.       

Hse No.       

Inspection Date

1st       

Time Start       

Time End       

Inspection Date

2nd       

Time Start       

Time End       

SURFACE PREPARATION

1. substrate

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

2. level / plumb using mortar pegs

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

3. splatterdash applied

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

4. exmet installed

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

BASE COAT

5. Wet the surface

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

6. groove line (using pvc / alum strips) installed

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

7. level and scratch to receive finish coat

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

FINISHING COAT

8. base coat cured

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

9. evenness

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

10. squareness

Contractor’s Rep Inspection

1st

2nd

Description of Non-compliance      

name       

Signature       

Date       

Calculated Plastering Area (m2)