PTW – work at height on mobile elevated work platform (mewp- scissor lift boom lift)
Magicsoft Asia night
PROJECT :
work at height on mobile elevated work platform (mewp- scissor lift boom lift)
Part 1: Application
Validity Period (Date & Time of work) :
From: 09/08/2018 (Date) 19:00 (Time)
To: 10/08/2018 (Date) 07:00 (Time)
Contractor :
Magicsoft Asia
No. of Supervisors : test
Description of work : test
No. of Workers : 10
Daily Check By Work Supervisor-In-Charge and/or Safety Assessor (Yes, No, “NA“ for Not Applicable)
Minimum Safety Requirements
Approved Risk Assessments available Yes
Safe Work Procedures available Yes
Job Specific Fall Prevention Plan available Yes
Traffic Management Plan established and available Yes
PTW/ Location Plan displayed at place of work Yes
Workers are briefed on the hazards & corresponding control measures Yes
Workers are medically fit to work/ not feeling unwell/ not overworked Yes
Workers are reminded to do Last Minute Risk Assessment (LMRA) before start work Yes
Adequate safe means of access/ egress provided. Yes
Adequate lighting provided at workplaces & along access/ egress Yes
Safety harness with double lanyard & shock absorber provided/ used as fall arrest-eqpt or Safety belt provided & used as fall-restrain eqpt Yes
Monthly Inspection & colour coding of PPE implemented Yes
LP certificate valid for 6 months Yes
Competent mechanics appointed Yes
Monthly maintenance done authorised mechanics Yes
Competent operator appointed & name list with photo displayed Yes
Pre-operation check carried out by authorised operator Yes
Comply with safe working load; no overloading of platform Yes
Barricades and signages provided below; area clear of incompatible works Yes
Good housekeeping maintained – no storage of unused materials/ debris on platform Yes
Banksman deployed & station on site when in operation/ work in progress Yes
Inspection of work area after inclement weather – safe to work after inclement weather Yes
Others :Yes
Part 2: Check & Endorsement
a) I have read & understood this permit & agree to work in accordance with the provisions of the RA/ SWP/ Method Statement & the safety requirements stated in this permit.
b) I have checked and satisfied that the confined space is safe & healthy for persons to enter and work in
a. Applicant / Work Supervisor (Manhole/ Confined Space/ Tunnel Supervisor)
Name Keke –
Signature
Time 16:56
b. Safety Assessor (Shimizu) (Confined Space Safety Assessor)
Name
Safety Assessor
Signature
Time 11:06
c. Shimizu Engineer/ Supervisor In-Charge (Manhole/ Confined Space/ Tunnel Supervisor)
Name Engineer
Signature
Time 11:07
Part 3: Issued By
a) I am satisfied that proper evaluation of risk & hazards involved based on available information
b) I am satisfied that the confined space is safe & healthy for person to enter and work in
c) I am satisfied that effective steps have been taken to prevent any ingress of toxic/flammable subst/gas/vapor
d) The working personnel are informed of the hazards & protection counter measures to be taken
Site Overall In-Charge (SC PM / Appointed Duty Personnel)
Name PM
Signature
Time 11:07
Part 4: Notice of Revocation or Closure
a) Work has been terminated/ completed
b) Housekeeping has been carried out
c) Work area is safe for other personnel
Applicant/ Work Supervisor (Manhole/ Confined Space/ Tunnel Supervisor)
Name Applicant
Signature
Time 11:08
Part 5: Confirmation of Revocation or Closure
a) Work has been terminated/ completed
b) Housekeeping has been carried out
c) Work area is safe for other personnel Site Overall In-Charge (SC PM / Appointed Duty Personnel)
Name PM
Signature
Time 11:08
Photo Attachment
Safety barriers & warning signs erected to prevent unauthorised entry | Confined Space Register available | Adequate safe means of access into or egress provided |
Suitable & Sufficient lighting provided at workplaces) | tinuously within CS & at the place of work | Environment within the confined space is safe for entry & safe to work in |