1. Design
| Remarks | |
| Design by competent person/QP: | |
| Drawing sufficient in detail for construction: | |
| Adequate diagonal and horizontal braces in the design: | |
| Design checked by Construction Manager/Project Manager: | |
| Copy of drawing extended fro Formwork Supervisor: |
2. Erection
| Remarks | |
| Material used in adequate in strength: | |
| Form constructed to accordance to design: | |
|
Forms adequately braced or tied to maintain shape and position (with props, tie back): |
|
| Forms effectively secured to the shoring system: |
3. Shoring
| Remarks | |
| Shoring system in good condition and in adequate size: | |
| Spacing of members and bracing is as designated: | |
|
Shoring rests on firm and uniform footing: |
|
| Proper access provided for inspection: |
4. Supervision and Inspection
| Remarks | |
| Erection supervised by designated person: |
5. Stripping
| Remarks | |
| Commence only after concrete is set: | |
|
Reshoring provided to support slabs and beams after stripping: |