EHS-Checklists-And-Forms
Permit No:
Sub Permit No.
Valid for 7 days from the date & time specified. Sketch and checklist to be attached where applicable
Part 1A: Application – to be submitted by 1st Tier Sub-Contractor PM / CM
Work Performed by (Company name & Trade) : MAGICSOFT ASIA SYSTEMS
Name of PM / CM: Magicsoft .
Contact No: text
Location & description of work Use Appendix-A activity (Attach Layout plan) :Use Appendix-B (Job requires Lock Out Tag Out (LOTO) & add-on job)
Work requires Lock Out Tag Out?: YES
If yes, state number of work processes that requires LOTO: (Please use appendix-B for the task requires LOTO)
To facilitate LOTO do you required to;
If yes, (Please highlight in appendix-A and apply separate sub-permit for WAH and/or confined space entry permit to facilitate LOTO)
1. Work at height (WAH): YES
2. Enter into confined space: YES
Date & Time of Work:
From: 12/12/2017 15:46
To: 12/12/2017 15:46
No. of Persons : text
Type of Permit-to-work (PTW) / Checklist (select only one unless the work process requires > 1 PTW)
☐ Work at height (>2m)
☐ Excavation work(>1.5 m)
☐ Lifting operation
☐ Hot work
☐ Confined Space Work
☐ Piling work
☐ Tunnelling work
☐ Demolition Work
☐ Works Above Clean Room Ceiling
☐ Floor opening / Raised Floor/ Barricade Removal Checklist
Part 1B: Checking, Evaluation, Assessment & Review of EHS Requirements – By Sub-Contractor EHS Personnel
– I confirm that the work area(s) stated in the appendix is/are safe and environment aspects are eliminated.
– All reasonably practicable measures are taken to safeguard the safety and health of work personnel and preservation of the environment.
EHS Personnel Name & Sign: – –
Date & Time: –
PM/CM Name & Sign: Magicsoft .
Date & Time: 12/12/2017 15:46
Part 2: Final Review and Assessment of EHS Requirements by Safety Assessor (M+W EHS Department)
– I have reviewed the risk assessment and EHS requirements for the intended work(s) and I am satisfied with the control measures
– The work shall be stopped and the permit will be void if there is any change in work conditions
– Additional instructions (if any):
Name & Sign: – –
Date & Time: –
Part 3: Approval by Authorized Manager (M+W Project Manager / Construction Manager)
– I am satisfied that all reasonably practicable measures are/will be implemented, enforced and the working personnel are informed of the safety hazards and environmental impacts and protection counter measures to be taken.
– Sub-contractors are instructed that any work not stated in the description (Appendix-A and B (for add-on job)) shall not proceed.
– Additional instructions (if any):
Name & Sign: – –
Date & Time: –
Part 3A: Permit Revocation by Authorized Manager (M+W Project Manager / Construction Manager)
This Permit-To-Work is REVOKED and associated activities shall CEASE IMMEDIATELY
– Reason(s): – –
– Revoked by Authorized Manager (Sign, date, time) –
– Acknowledged by PTW applicant (Sign, date, time)
Part 4: Closure of Permit-To-Work by 1st Tier Sub-Contractor PM / CM
I confirmed that the work has completed, the work area has been checked & cleared and no new hazard is introduced.
Sub-con PM / CM: (Name & Sign) – –
Date & Time: –
Verified by M+W System Supervisor / Engineer
(Name & Sign) – –
Date & Time: –
Note: A copy of this approved Parent Work Permit to be displayed in specified location throughout the duration of work. Individual permit shall be displayed at the work location