CHECKLIST FOR PAINTING
PROJECT (Autofill by Project Name)
MT SOPHIA1
Reference Nos (Autofill by Form Number)
autofill
Block No.
Storey No.
Plot No.
Hse No.
Inspection Date
1st
Time Start
Time End
Inspection Date
2nd
Time Start
Time End
SURFACE PREPARATION
1. substrate cured and dry cracks / holes patched
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
2. surface sanded down / scrapped
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
APPLICATION
3. to manufacturer’s instruction
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
4. check method (spray / roller / brush)
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
5. protection to wall, floor, frames, locks, hinges, etc.
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
SEALER/PRIMER COAT
6. correct type
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
7. evenness / thickness
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
UNDER COAT
8. grouting around frame
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
9. verticality
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
FINSIHING COAT
10. undercoat dried
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
11. even application
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
12. clean up
Contractor’s Rep Inspection
1st
2nd
Description of Non-compliance
name
Signature
Date
Calculated Painting Area (m2)