Permit for Pilling Work(s)
Image
Please use mobile phone to attach photo
Location of work 施工位置
Machine Operator’s Name 吊车驾驶员姓名
Description of work 工作性质叙述
Piling Machine No. 吊车牌照
Permit validity Period 准证有效期(From)
Safe Working Load 安全负重量
Permit validity Period 准证有效期 (Till)
Piling Work(s) image
This permit is valid only for the period stated above. The conditions of issue must be complied with throughout the duration of work. This permit may be revoked at any time. You are responsible for the copy of this permit to display at work location till completion of the above work or expiry or revocation of permit and must produce it on request. 此准证以上述准证期为限。在工作期严格遵守所有工作条件与规格否则此准证将以作废论。你须承担此准证所述的责任,保存此准证并随时出示以供检验之用。
STAGE 1 – Application for PTW by the permit requester (STRAITS Engineer/Site Supervisor or Sub contractor Piling Supervisor) 阶段 1–准证申请者 (海峡工程师/工地管工 或 二手承包商吊车举吊监督)
I have checked and confirmed that the following WSH measures have been taken to ensure safety and health of persons at work and fully understand the nature of work and the WSH compliances. 本人已检查与确认以下所列项目皆遵照相关安全条规,并充分明瞭上述工作性质与所需遵照的安全条规。I will supervise & continuously monitor the piling works and undertake to stop/cease the operation should there be any unsafe condition or potentially hazardous situation arose during the course of work. I undertake to report immediately if there is any incompatible work found in and around the vicinity. 本人将监督所有举吊工作并担保一旦发现任何导致工地意外的危险性举动或环境将即刻停。
Valid LM Certificate available
Yes
No
NA
MOM licensed crane operator available
Yes
No
NA
Approved Examiner test certificate available for Lifting Gears f
Yes
No
NA
Inspection checklist by crane operator & Lifting Supervisor available
Yes
No
NA
Qualified Lifting Supervisor available
Yes
No
NA
PE design available for underpinning, sheet piling, bracing or other means of shoring to support any adjacent structure or with worksite
Yes
No
NA
Piling machine access in good condition
Yes
No
NA
All bored hole properly barricaded
Yes
No
NA
Safe Work Procedure, Risk Assessment and tool box meeting conducted/ briefed to all workers; records maintained
Yes
No
NA
Spreader beam available (for lifting rebar cage) and in safe working condition
Yes
No
NA
Method statement for lifting work available
Yes
No
NA
Lifting Appliances are in good condition
Yes
No
NA
All underground services (e.g. pipe or cables etc.) identified/check by designated person; cable detection drawings available
Yes
No
NA
Sitting distance from overhead electrical cable Min 3 meters and roped off with warning sign
Yes
No
NA
Piling / Lifting area cordoned off
Yes
No
NA
Lifting gear color code system is implemented / followed
Yes
No
NA
Warning signs are displayed at conspicuous location
Yes
No
NA
All necessary PPE provided to work personnel e.g. ear muff, goggles etc…
Yes
No
NA
Qualified Lifting Supervisor, Rigger & Signalmen are present and they are in proper attire
Yes
No
NA
Engineers check on probable soil settlement and any damages induced and affect the surrounding buildings.
Yes
No
NA
Piling operation process supervised by trade supervisor / designated person
Yes
No
NA
Designated person is appointed for the inspection of piling equipment
Yes
No
NA
name
Signature
designation