New Project Form
SHOW GEOLOCATION
Reference Form
Site Location
Work Location
submitter
SITE ENVIRONMENTAL CONTROL REPORT
Date
To
Name of Occupier of Construction Site
Designation
Address of Company
SITE ENVIRONMENTAL CONTROL REPORT
1. I submit the Site Environmental Control Report on the above construction site from
Date from
Date to
2. The areas of inspection and recommendations described in this report includes (please for the reports that are attached)
Environmental health hazards and irregularities observed on the construction site
Recommendations on actions to be taken by the occupier to rectify the irregularities
Vector borne or infectious disease outbreaks, which took place
Investigation conducted on vector borne or infectious disease outbreaks, which took place
Campaigns, competition, training course held or to be held on the construction site
Suggestions on co-operation necessary between the management of the construction site and any persons as to ensure observance of the Act
Yours faithfully,
Name of ECO
Signature of ECO
SIGN
Date
(I) Environmental Health Hazards and irregularities observed on construction site/ recommendations to maintain healthy working conditions on the construction site
The following irregularities were observed on the construction site
(Please fill in to indicate the irregularity)
A. Solid Waste Management
I) Overloading or spillage of construction wastes from skips
Recommendations on work to be carried out
II) Skips placed along public roads
Recommendations on work to be carried out
III) Amount of construction waste taken out from site is different from amount disposed of
Recommendations on work to be carried out
IV) Organic food wastes stored together with construction wastes and not removed daily
Recommendations on work to be carried out
V) Insufficient refuse bins lined with plastic bags around the bangsals
Recommendations on work to be carried out
VI) Refuse bins not properly covered
Recommendations on work to be carried out
B. Vector Control Measures
– Mosquito Breeding
I) Potential mosquito breeding grounds observed, e.g. water bearing receptacles, ground depressions, uneven grounds, etc.
Recommendations on work to be carried out
II) Construction site and/ or bangsal littered
Recommendations on work to be carried out
III) Sand granular insecticide not applied into perforated bricks according to schedule
Recommendations on work to be carried out
IV) Anti-mosquito oil and insecticides not applied into stagnant water according to schedule
Recommendations on work to be carried out
V) Thermal fogging not carried out on the construction site at least once a week
Recommendations on work to be carried out
-Rodent and Fly Infestation
I) Food left in open and not stored in rodent-proof rooms or cabinets
Recommendations on work to be carried out
II) Rat burrows observed
Recommendations on work to be carried out
III) Potential fly breeding grounds observed
Recommendations on work to be carried out
C. Infectious disease
I) Foreign workers not screened for history of malaria
Recommendations on work to be carried out
II) Food handler(s) not inoculated against Typhoid
Recommendations on work to be carried out
III) Food handler(s) above 45 years old not screened for tuberculosis
Recommendations on work to be carried out
D. Noise Control Measures
I) Noise recorded at monitoring stations exceeds the maximum permissible level
Recommendations on work to be carried out
II) Generators and machineries sited close to residential estates
Recommendations on work to be carried out
III) Noisy activities, e.g. piling, concreting carried out during night time
Recommendations on work to be carried out
IV) Equipment and machinery cause excessive noise emission due to irregular maintenance
Recommendations on work to be carried out
V) No notice issued to inform residents on impending noisy construction works
Recommendations on work to be carried out
E. Air Pollution Control & Dust Abatement
I) Lorries and vehicles carrying construction materials not properly and inadequately covered
Recommendations on work to be carried out
II) Vehicles not washed at the paved wash bay before they leave the worksite
Recommendations on work to be carried out
III) Emission of dark smoke from construction equipment and machinery
Recommendations on work to be carried out
IV) Evidence of open burning of construction waste carried out
Recommendations on work to be carried out
V) Dust preventive measures not taken, e.g. water sprinklers/ spray, shielding, netting, covers/ hoarding for aggregate/ sand stores not provided/ maintained
Recommendations on work to be carried out
VI) No debris chutes to transfer debris from higher floors to ground floor
Recommendations on work to be carried out
F. Food Hygiene
I) Displayed food not covered or properly protected
Recommendations on work to be carried out
II) Food handlers using bare hands and not wearing gloves or using tongs or other suitable implements when handling ready-to-eat or cooked food
Recommendations on work to be carried out
III) Poor personal hygiene practices observed, e.g. smoking, dirty attire, etc.
Recommendations on work to be carried out
IV) Dirty equipment and cooking utensils observed
Recommendations on work to be carried out
V) Preparing food outside kitchen area
Recommendations on work to be carried out
G. Silt Control
I) Perimeter cut-off drains unlined/ silted
Recommendations on work to be carried out
II) Silt traps silted
Recommendations on work to be carried out
III) Silt fences damaged or choked
Recommendations on work to be carried out
IV) Silt fences and supporting posts not firmly embedded in the ground
Recommendations on work to be carried out
V) Silt traps interceptors not cleared
Recommendations on work to be carried out
VI) Inadequate silt control facilities provided
Recommendations on work to be carried out
VII) Drains in vicinity of worksite silted or obstructed due to the construction works
Recommendations on work to be carried out
VIII) Water run-off from the worksite is not channelled through the silt fences into silt traps
Recommendations on work to be carried out
IX) Discharge of water directly into public drains
Recommendations on work to be carried out
X) Earth surfaces or slopes adjacent to any drain not closed, turfed, paved or covered
Recommendations on work to be carried out
XI) Inadequate measures taken to prevent any earth, sand, top-soil, cement, concrete, debris or any other material to fall or be washed into the drains from any stockpile thereof
Recommendations on work to be carried out
H. Others
I) Indiscriminate discharge of wastewater into watercourses, e.g. workers bathing and washing outside approved areas, defective sanitary/ sewer pipes, overflow from holding tank, overloading of septic tank, etc.
Recommendations on work to be carried out
II) Septic tank(s)/ holding tank(s) and/ or chemical/ portable toilet(s) overflowing or not maintained
Recommendations on work to be carried out
III) Servicing and repair of vehicles/ equipment carried out without facilities to contain the waste oil
Recommendations on work to be carried out
IV) Waste/used oil not properly collected and sent to a licensed toxic waste collector
Recommendations on work to be carried out
V) Soil treatment was not carried out by pest control operator in compliance with the water pollution control requirements.
Recommendations on work to be carried out
VI) Drums/ carboys/ containers with oil/ chemicals found outside bunded/ permitted areas
Recommendations on work to be carried out
VII) Oil spillages outside bunded/ controlled area
Recommendations on work to be carried out
(ii) Vector borne/ food borne/ infectious disease outbreak(s) which took place
* To be completed if any vector borne/ food borne/ infectious disease outbreak(s) took place
1.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
2.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
3.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
4.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
5.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
6.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
7.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
8.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
9.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
10.Type of Vector Borne/ Food Borne/ Infectious Disease
Vector Borne
Food Borne
nfectious Disease
No. of people affected
Cause of outbreak
Follow-up action
Type of treatment
(A) Self-Medication
(B) Clinical-Treatment
(C ) Hospitalisation
Remarks
(III) Public Education
* To be completed if any public education activity/ activities carried out
1.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
2.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
3.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
4.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
5.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
6.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
7.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
8.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
9.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved
10.Type of activity (Exhibition, Video show, brochures, pamphlets, etc.)
Exhibition
Video show
brochures
pamphlets
etc.
Purpose of activity
Where it is held
Duration of activity
Does it involve all employees (Yes/ No)
Yes
No
If no, indicate number of employees involved