PTW – demolition work permit
Magicsoft Asia night
PROJECT :
DEMOLITION WORK PERMIT
Part 1: Application
Validity Period (Date & Time of work) :
From: 09/08/2018 (Date) 19:00 (Time)
To: 10/08/2018 (Date) 07:00 (Time)
Contractor :
Magicsoft Asia
No. of Supervisors : test
Description of work : test
No. of Workers : 10
Daily Check By Work Supervisor-In-Charge and/or Safety Assessor (Yes, No, “NA“ for Not Applicable)
Minimum Safety Requirements
Approved Risk Assessments available Yes
Safe Work Procedures available Yes
PTW/ Location Plan displayed at place of work Yes
Workers are briefed on the hazards & corresponding control measures Yes
Workers are medically fit to work/ not feeling unwell/ not overworked Yes
Workers are reminded to do Last Minute Risk Assessment (LMRA) before start work Yes
Safety barriers & warning signs erected to prevent unauthorised entry Yes
Adequate safe access provided for workers access to workplaces Yes
Safe work platform provided i.e. Min 500mm wide/ secured & of sound materials Yes
Adequate edge protection provided – top rail/ mid rail/ toe board (Top rail ≥ 1m high / mid rail < 0.6m high / toe board ≥ 90mm high) Yes
Overhead protection/ debris netting provided Yes
Demolition work properly scheduled to minimize inconvenience to public/tenant Yes
Existing affected services identified & terminated or diverted & protected Yes
Adequate lighting provided at workplaces Yes
applicant/ SC Engr/ Sup to provide continuous monitoring & supervision on site Yes
Competent Operator/ worker appointed & briefed on sequence of work Yes
Regular removal of demolition debris to prevent overloading of structures Yes
Safe access for machinery identified & demarcated on site Yes
PE Design Calculation/ Drawings/ COS available for removal of load bearing structures Yes
Inspection of work area after inclement weather – safe to work after inclement weather Yes
Others :
Part 2: Check & Endorsement
a) I have read & understood this permit & agree to work in accordance with the provisions of the RA/ SWP/ Method Statement & the safety requirements stated in this permit.
b) I have checked and satisfied that the confined space is safe & healthy for persons to enter and work in
a. Applicant / Work Supervisor (Manhole/ Confined Space/ Tunnel Supervisor)
Name Keke –
Signature
Time 16:56
b. Safety Assessor (Shimizu) (Confined Space Safety Assessor)
Name
Safety Assessor
Signature
Time 11:06
c. Shimizu Engineer/ Supervisor In-Charge (Manhole/ Confined Space/ Tunnel Supervisor)
Name Engineer
Signature
Time 11:07
Part 3: Issued By
a) I am satisfied that proper evaluation of risk & hazards involved based on available information
b) I am satisfied that the confined space is safe & healthy for person to enter and work in
c) I am satisfied that effective steps have been taken to prevent any ingress of toxic/flammable subst/gas/vapor
d) The working personnel are informed of the hazards & protection counter measures to be taken
Site Overall In-Charge (SC PM / Appointed Duty Personnel)
Name PM
Signature
Time 11:07
Part 4: Notice of Revocation or Closure
a) Work has been terminated/ completed
b) Housekeeping has been carried out
c) Work area is safe for other personnel
Applicant/ Work Supervisor (Manhole/ Confined Space/ Tunnel Supervisor)
Name Applicant
Signature
Time 11:08
Part 5: Confirmation of Revocation or Closure
a) Work has been terminated/ completed
b) Housekeeping has been carried out
c) Work area is safe for other personnel Site Overall In-Charge (SC PM / Appointed Duty Personnel)
Name PM
Signature
Time 11:08
Photo Attachment
Safety barriers & warning signs erected to prevent unauthorised entry | Confined Space Register available | Adequate safe means of access into or egress provided |
Suitable & Sufficient lighting provided at workplaces) | tinuously within CS & at the place of work | Environment within the confined space is safe for entry & safe to work in |