Weekly EHS Inspection
| Subject: |
|
| Inspection Date: |
|
| Inspected By: |
|
| Reviewed By: |
|
1. General
| a. |
Personal protective equipment worn by workers/site staff (safety harness, helmet shoes, ear plug, repirator, etc) |
| Locations |
|
| Findings |
|
| Remarks |
|
| b. |
Safety information board and assembly stage provided |
| Location |
|
| Findings |
|
| Remarks |
|
2. Scaffold
| a. |
No missing cross bracing |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
No torn nettings |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
No accumulations of waste and construction debris at working platform |
| Location |
|
| Findings |
|
| Remarks |
|
| d. |
No missing toe board |
| Location |
|
| Findings |
|
| Remarks |
|
| e. |
Gaps between scaffold and building edge no more than 300mm where humans could fall |
| Location |
|
| Findings |
|
| Remarks |
|
| f. |
If the above mentioned gap is >300mm, working platform to be provided with toe boards and 2 or more guard rails |
| Location |
|
| Findings |
|
| Remarks |
|
| g. |
Working platform must be provided at every alternate lift |
| Location |
|
| Findings |
|
| Remarks |
|
| h. |
No single plank (less than 500mm width) |
| Location |
|
| Findings |
|
| Remarks |
|
| i. |
Scaffold erected at least 1m above construction level |
| Location |
|
| Findings |
|
| Remarks |
|
| j. |
Designated access to scaffold clearly marked |
| Location |
|
| Findings |
|
| Remarks |
|
| k. |
Proper signages on scaffolds and access points |
| Location |
|
| Findings |
|
| Remarks |
|
| l. |
Peripheral overhead shelter provided |
| Location |
|
| Findings |
|
| Remarks |
|
| m. |
Proper entry/exit points to the building under construction |
| Location |
|
| Findings |
|
| Remarks |
|
| n. |
Proper tie back provided as per PE design |
| Location |
|
| Findings |
|
| Remarks |
|
3. Barricades
| a. |
Barricade to open sides of buildings/scaffolds provided |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
Barricade to lift opening provided |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Barricade and cover-up all openings in floor provided |
| Location |
|
| Findings |
|
| Remarks |
|
4. Electrical hazards
| a. |
Electrical wiring properly hand on insulated material |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
Approved type SOA used |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Electrical wires/hand tools are in good condition |
| Location |
|
| Findings |
|
| Remarks |
|
| d. |
Welding machine an other electrical equipments are earthed |
| Location |
|
| Findings |
|
| Remarks |
|
| e. |
Temporary electrical wiring system checked by LEW monthly |
| Location |
|
| Findings |
|
| Remarks |
|
| f. |
Socket outlet assembly (SOA) must be totally enclosed and locked with no live terminal or parts exposed |
| Location |
|
| Findings |
|
| Remarks |
|
5. Oxygen – fuel gas equipment
| a. |
Implementation of permit to work system – hot work |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
Gas cylinder kept in up-right position and kept at a safe distance from heat sources |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Hose connections clamped or securely fastened. No jubilee clip shall be used as a hose clamping device |
| Location |
|
| Findings |
|
| Remarks |
|
| d. |
Flashback arrestor fitted at the pressure regulator outlet of every gas cylinder |
| Location |
|
| Findings |
|
| Remarks |
|
| e. |
Non return valve fitted wbetween each gas torch inlet an gas hose |
| Location |
|
| Findings |
|
| Remarks |
|
| f. |
Fire extinguisher provided |
| Location |
|
| Findings |
|
| Remarks |
|
6. Authorized persons
| A. |
Machinery operated by authorized/competent person |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
P/M Hoists examined by AP at least once in 6/3 months |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Gondola/mast platform examined by AP at least 6/3 months |
| Location |
|
| Findings |
|
| Remarks |
|
7. Hoisting operation
| a. |
Approved signaler/rigger/liftingsupervisor/crance operator to comply with lifting regulation |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
lifting gear and appliance examined by AP at least once in every 12/6 months |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Proper access preparation for cranes and corrrect hoisting procedures (access checked by engineer) |
| Location |
|
| Findings |
|
| Remarks |
|
8. Excavation
| a. |
Excavation checklist submitted |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
Ladder provided if excavation exceed 1.2 metres in depth |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Excavated area adequately shored if it is more than 1.5 metres deep |
| Location |
|
| Findings |
|
| Remarks |
|
| d. |
Open sides of excavation effectively barricade if it is more tha 1.5 metres deep |
| Location |
|
| Findings |
|
| Remarks |
|
| e. |
Materials placed at least 610mm back from the edge of open excavation |
| Location |
|
| Findings |
|
| Remarks |
|
9. Water pollution control
| a. |
Slit laden/slit trap used to reduce slit content; discharging only fresh water into the drain |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
Vehicular truck slit, mud, etc washed before leaving the site |
| Location |
|
| Findings |
|
| Remarks |
|
10. General housekeeping and vector control
| a. |
Step on/tripping hazard eliminated |
| Location |
|
| Findings |
|
| Remarks |
|
| b. |
Materials placed at least 1m away from edge of building |
| Location |
|
| Findings |
|
| Remarks |
|
| c. |
Access free from obstruction |
| Location |
|
| Findings |
|
| Remarks |
|
| d. |
No water-bearing receptacles |
| Location |
|
| Findings |
|
| Remarks |
|
| e. |
Ground is leveled properly, no depression |
| Location |
|
| Findings |
|
| Remarks |
|
| f. |
Mosquitoes breeding ground elimnated |
| Location |
|
| Findings |
|
| Remarks |
|
| g. |
Routine vector control is carried out |
| Location |
|
| Findings |
|
| Remarks |
|
11. Others: ______________